Automate pipeline job execution by creating schedules, defining run frequency, and managing schedule status. You can view, edit, enable, disable, or delete schedules in the Schedules tab.
Schedules in the Data Integrity Suite lets you automate pipeline job execution. You can set up schedules to run pipelines at specific intervals for timely processing and integrity checks.
The Schedules tab displays a table with the following columns:
- Pipeline: The name of the pipeline.
- Run Configuration: The name of the run configuration applied to the pipeline. Click the ellipsis menu to edit, disable, or delete the schedule.
- Schedule: The frequency and timing details of the schedule. Click Edit Schedule to modify.
- Schedule Status: Shows whether the schedule is
enabled or disabled.What's changed: In the new user experience, Schedule Status appears as Status. For more information on the new experience, see About the new user experience.
Use the Search field to filter schedules
by run configuration name.
Warning: Before you create a schedule, you need a run
configuration applied to your pipeline. You can create a run
configuration and schedule together, or add a schedule to an
existing run configuration. Ensure both the pipeline and run
configuration are valid. If either shows an invalid icon,
resolve the issue first.
To create a schedule:
- Go to .
- Click Configure Schedule.
- Select the pipeline for which you want to create a schedule.
- Click Next.
- Select an existing run configuration. If a run configuration is not available, create a run configuration for the pipeline before you save the schedule.
- Enable the schedule toggle.
- Choose the run frequency and time (UTC).
- Click Save.
- To edit a schedule: In the Schedule column, click Edit Schedule and modify the frequency and timing as needed.
- To enable or disable a schedule: Click the ellipsis in the Run Configuration column and select Enable Schedule or Disable Schedule.
-
To delete a schedule: You can delete a schedule from either the Schedules tab or the Pipeline list.
- Schedules tab: Click the ellipsis menu in the Run Configuration column and select Delete Schedule.
- Pipeline list: Go to the pipeline Run Configuration Settings, click Schedules and select Delete Schedule.