A replication project consists of multiple pipelines that capture data changes from tables in your dataset. These projects operate in test or production environments, retrieving changed data and applying it to target sources.
Add, edit, and view replication project
Add replication project
- Go to and select + Add Project.
-
Enter a unique name for the project.
Note: The project name cannot be changed once created. Modifications can only be made through import or export.
- Enter a brief description (optional).
- Select Add Project. The new project appears in the projects pane.
Edit replication project
- Open the context menu for the project and select Edit.
- Modify the description as needed.
-
Select
Save
.
Note: If the project has been committed at least once, saving creates a new configuration file. To implement changes, commit to the server(s) and redeploy the project.
View replication project details
Open the context menu for the project and select Details to view:
- Project name: The unique name of the project.
- Description: Brief overview of the project.
- Replication engine: Details of the associated replication engine.
- Created By: User who created the project.
-
Last Refreshed
: Timestamp of the last refresh.
To view alerts, select Alerts. Select Cancel to close.
- Statuses: Current statuses of engine processes, replication, and capture.
On the same page, open Backlog to view the number of data rows waiting to be processed.
Start and stop replication project
Start a replication project
Before starting, ensure you have validated, committed, and deployed any configuration changes.
- You can only start one project at a time.
- If the project is currently deploying, wait for deployment to finish.
- If the project status is Ignored, you must stop ignoring it first. For imported models, the project can be started regardless of its ignored status.
- Once started, the project remains active until stopped.
- Go to .
- Open the context menu for the project and select Start.
-
Select
Start
again to confirm.
Note: If Start is unavailable, the project may be deploying, already started, or more than one project is selected.
When restarting a previously stopped project:
- Data flows resume from where they were interrupted.
- Change data capture starts for all enabled tables (Oracle databases).
- Log readers that were stopped are restarted.
- Data flow replication and copy processes on the runtime servers are started.
Stop a replication project
Stop a project before any of the following activities:
- Shutting down the source database or rebooting the host server for maintenance.
- Rebooting the kernel host server when the kernel runs on a remote system.
- Changing the runtime engine IP address or hostname: If not stopped first, edit the engine properties to match the changes and redeploy.
- Clearing replication backlogs for any pipeline.
- Modifying the metabase (add, upgrade, or delete).
- Deleting or ignoring the project.
- Running a forced deployment.
When a project is stopped:
- The associated kernels on the runtime servers shut down.
- Change data capture is suspended for Oracle sources.
- Replication and copy processes on the runtime engine are stopped.
- Active log readers are stopped.
- Go to .
- Open the context menu for the project and select Stop.
- Select Stop again to confirm.
After stopping, verify that all statuses show as stopped in the projects pane.
View replication project alerts
View alerts to identify issues, track anomalies, and determine what action may be needed on runtime servers. Alert icons indicate severity:
- Yellow exclamation: Warning that does not affect replication (for example, duplicate kernel entries).
- Blue information: Informational events during normal kernel operation.
- Red cross: Error that requires immediate attention.
- Go to .
-
Open the context menu for the project and select
Alerts
. The Alerts window opens with the following filters:
- Message type: Filter by message type, such as warning, error, or informational.
- Runtime engine: Filter alerts by engine.
- Pipeline Name: Filter alerts by pipeline.
- Search: Search by pipeline name, message type, or other criteria.
The alerts table shows:
- Message: Alert message details.
- Replication Engine: Engine associated with the alert.
- Pipeline Name: Pipeline affected by the alert.
- Logged: Timestamp when the alert was logged.
- Refresh / Last refreshed: Manually refresh the grid; shows the time of the last refresh.
- Close: Closes the alerts window.
Note: If CDC is down, this message appears: An unexpected error occurred. Try the request again. If the problem persists, contact support. Latest alerts are not available.
Validate replication project configuration
Validation checks for errors and inconsistencies before committing to runtime servers. Results are prioritized by severity and include error and warning counts. Checks include: metabase installation and version, table and column mapping accuracy, data connection validity, and source database availability.
- Go to .
- Open the context menu for the project and select Validate.
- Review Validation Results. If errors prevent commitment, use the details to resolve them.
- Select Copy to Clipboard to copy results for sharing.
- Select Close.
Apply configuration changes
Deploying activates the latest committed configuration on all runtime servers. You can batch configuration changes over several days and deploy at a convenient time, such as off hours.
- Go to .
- Open the context menu for the project and select Apply Configuration Changes.
-
Select one or more options:
- Stage configuration changes: Commit changes for all replication pipelines.
- Make Configuration Changes Active: Deploy changes for all replication pipelines.
- Display alerts to monitor progress: Opens the Alerts dialog after selecting Apply.
- Force making configuration changes active: Forces changes to become active.
-
If
Force making configuration changes active
is selected, configure the timeout fields:
- Backlog is empty: Time for backlog to clear before deployment starts (default: 4 minutes).
- Dataset capture is disabled: Time for capture to disable (default: 8 minutes).
- Replication is stopped: Time for replication to stop (default: 4 minutes).
-
Select
Apply
.
Note: Apply is enabled only if Stage Configuration Changes or Make Configuration Changes Active are selected.
Manage diagnostic bundles
Diagnostic bundles collect logs, configuration, and connection information for a project across all runtime engines. Use bundles for troubleshooting or to share with Support.
- Go to .
- Open the context menu for the project and select Manage Diagnostic Bundle. The Diagnostic Bundles page opens listing all bundles in the current workspace.
Create a diagnostic bundle
- Select + Create Bundle.
- Enter a name and description. For the list of collected log files, see Relevant log files for support.
-
Select
Create
.
Note: The bundle is created at the path shown in Location of bundle and written to a zip file.
View a diagnostic bundle
Select a bundle link on the Diagnostic Bundles page to open the Diagnostic Bundle Details view (status, creation date and time, creator, and file location).
Stop a diagnostic bundle
- Select one or more in-progress bundles from the Diagnostic Bundles page.
- Select Stop and confirm. Already-retrieved files are kept and a partial zip is created with status set to partial.
Delete a diagnostic bundle
- Select one or more bundles that are not in progress.
- Select Delete and confirm.
Debug and export replication project
Debug a replication project
When debugging is enabled, warnings, errors, and details for all kernel and listener processes are written to kernel logs on the runtime engine.
- Go to .
- Open the context menu for the project and select Debug.
-
Select a debug mode:
- Standard: General replication project information.
- SQL: SQL statement details.
- Both: Standard and SQL combined.
- None: No debug output (default).
- Select OK.
Export project
- Go to .
- Select the checkboxes for the projects to export.
- Select Export selected projects.
- Choose All projects or Selected projects.
- Select Export user names if needed.
-
Choose a zip file location and select
Export
.
Note: Default filename: <ProjectName>-MMDDYYYY-HHMMSS for a single project; ConnectConfiguration-MMDDYYYY-HHMMSS for multiple projects.Warning: You cannot export if the filename field is blank.